Revamp Formaldehyde Plant

Upgrading an existing plant may help to expand the production capacity and to reduce the operational cost.

Dynea has extensive experience in revamps and upgrades of Formaldehyde plants to improve yield, increase capacity or improve the final product concentration and lower methanol in final product.

 

Normally a revamp or upgrade project has three phases :

Phase 1: Feasibility Study/Prebasic for Revamp and Modernisation of Formaldehyde Plant. Cost estimate +/- 20 %

Phase 2: Detail engineering for Revamp and Modernisation of Formaldehyde Plant. Cost estimate +/- 10 %

Phase 3:  Realisation of Revamp and Modernisation for the Formaldehyde Plant

 